The site is located in Kvanndal, Narvik municipality. The location, close to one of the largest central grid transformers in Northern Norway, provides high capacity and reliability on power supply.

KVANNDAL

68°34,7’N 017°35,5’E
>100 MW available, negative grid cost and ~25 ha

POWER CAPACITY
• 100 MW+
• 132 kV Voltage
• Renewable energy supply

GRID
• ~6-7 % marginal rate loss
percentage (2016 – 2017)
• ~1.0 km grid line to main
transformer station
• Redundant grid point
(8 power lines)

AREA SIZE
• Today ~25 ha = 250,000 m2
• Zoning in progress
• Fairly flat area including a gravel pit
• No large settlement next to site

FIBER
• Redundant fiber access
with international dark fiber
• Several operators

TIME TO MARKET
• 2021.
• Dependent on final
approval from Statnett/NVE
and road authorities

INFRASTRUCTURE
• 30 min to Evenes
international airport
• 12 min to Nordkraft HQ
/ Narvik

CLIMATE
• Average yearly temperature
= 2.9 celcius (Bjerkvik)